Building Works Update

Welcome to our building works page! Stay up to date with the developments of the exciting renovations taking place at our venues Wests Ashfield & Markets Club. 

Level 2

Our old Chinese Restaurant area, Golden Times and Wongs section on Level 2 will be replaced with an exclusive VIP section and a brand new food offering  – Wok On! bringing to you mouth-watering Asian cuisine. A modern twist on a traditional asian aesthetic, the new VIP section and dining area features layers of different textures from cobbled flooring to warm timbers and decorative screens. The dramatic entrance is through a zen inspired water feature surrounded by glowing walls with Asian inspired decorative patterns. The architecture of the space is inspired by the lucky number 8, with curves incorporated throughout. Touches of brass and red also bring luck. The area is separated into zones, including a private indoor and outdoor VIP areas and dining precinct.

Here are a few concept images and ongoing work in progress.

Updated: 16 September 2021

  • LEVEL 2 PROGRESS OVERVIEW-
  • Kitchen, range hoods, cool room, have all been roughed in.
  • Banquet seating has commenced
  • Louvers and auto sliding doors have been installed
  • Walls are up and partly sheeted
  • Front entry stairway/water feature has been framed
  • New Air-con has been installed
  • Job is 30% complete

Stay tuned for a complete make over of Markets Club. The exterior and interiors of the Club will receive major changes! What to expect? The interiors will integrate a modern design with touches of luxury, the new VIP area and sports lounge at is designed to be moody and welcoming. The VIP lounge is spacious and designed with ultimate privacy. The sports lounge is surrounded with large screens for optimum viewing of your favourite games adjacent to the bar. Each space incorporates timber, brass and feature lighting with high end detailing and furnishings.The exteriors will receive a complete refreshment backed with warm LED lighting. We can’t wait to welcome you!

Updated: 16 September 2021

  • MARKETS CLUB PROGRESS OVERVIEW-
  • Louvers installed
  • Joinery 60% complete
  • Sliding glass door installed
  • Air con 60% installed
  • Ceiling completed
  • Bathrooms tiled and waiting for joinery
  • Chandeliers installed
  • Carpets are being installed
  • Stage 1 of construction is 65% completed